Increase of Production Efficiency of Tractor Part by Industrial Engineering Technique: A Case Study of Automotive Part Factory
Main Article Content
Abstract
The objective of this research is to increase production efficiency of tractor part RX 175-E. The study of production of RX 175-E was composed of three processes. The first process is the punching of a hole with a 74 millimeter diameter on the material. The second process is the punching for 12 holes with 13 millimeter diameter. The last process is the edge trimming with 200 millimeter diameter. Overall process was studied and analyzed problems by the manufacturing engineering such as production process chart, time study, flow chart, cause and effect diagram, ECRS concept, 5W 1H concept, PDCA concept and Kaizen. The maximum lead time occurs on the second process. This process was improved by modifying punch mold. The original punching could make 12 holes in 2 times and the new mold design can finish in one punch. From the improvement of the second process, the production can increase efficiency and decrease working steps. The processing time is reduced from the original production six seconds per part.
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
เนื้อหาและข้อมูลในบทความที่ลงตีพิมพ์ในวารสารวิชาการปทุมวันถือเป็นข้อคิดเห็นและความรับผิดชอบของผู้เขียนบทความโดยตรง ซึ่งกองบรรณาธิการวารสารไม่จำเป็นต้องเห็นด้วยหรือร่วมรับผิดชอบใดๆ
บทความ ข้อมูล เนื้อหา ฯลฯ ที่ได้รับการตีพิมพ์ในวารสารวิชาการปทุมวันถือเป็นลิขสิทธิ์ของวารสารวิชาการปทุมวัน หากบุคคลหรือหน่วยงานใดต้องการนำทั้งหมดหรือส่วนหนึ่งส่วนใดไปเผยแพร่ต่อหรือเพื่อกระทำการใดๆ จะต้องได้รับอนุญาตเป็นลายลักษณ์อักษรจากวารสารวิชาการปทุมวันก่อนเท่านั้น