Graph theory with garbage Collection Route of Pa-Sao Subdistrict Municipality, Muang District, Uttaradit Province

Authors

  • Krida Chumchanchira
  • Chaiya Seayap
  • Warinsinee Wattanapanich

Keywords:

walk, Landfill, the shortest route

Abstract

In this research we investigates garbage collection routes of Pa-Sao Subdistrict Municipality, Muang District, Uttaradit Province to find the shortage length of garbage collection route that save both time and costs, and collect all garbage bins. The research results reveal that Zone A, B, and C has a total of walk 803 routes, 100 routes and 133 routes, respectively. The shortage length of garbage collection route in each zone is 36,043.65 meters, 20,130.08, and 6,754 meters, respectively. A total time spent on these garbage collection routes is 5 days, lesser than that of previous routes 1 day.

Downloads

Published

2017-06-30

How to Cite

1.
Chumchanchira K, Seayap C, Wattanapanich W. Graph theory with garbage Collection Route of Pa-Sao Subdistrict Municipality, Muang District, Uttaradit Province . Acad. J. Sci. Appl. Sci. [internet]. 2017 Jun. 30 [cited 2025 Apr. 25];1(1):69-84. available from: https://ph03.tci-thaijo.org/index.php/ajsas/article/view/3638