WIRE LOSS REDUCTION CASE STUDY: MACHINE AC81 – 18
Keywords:
loss reduction, automotive wire production, AC machines 81 – 18Abstract
The objectives of this research were to reduce the loss in the production process of automotive wiring of the sample companies. not more than 0.200 percent. From collecting data from the production process of automotive wiring. The most common problem was the waste Wire Loss from machinery AC No. 81-18. The researcher then analyzed the cause of the problem with a fishbone diagram, the why-why principle and the analysis of the source of the problem (Measurement System Analysis: MSA). The performance before the improvement between May - July, the total production was 165,000 kilograms, the amount of waste was 512 kilograms, representing 0.310 percent, which was the waste cost of 178.54 baht per kilogram, representing a value of 91,412.48 baht. Adjusted between August - October 2022. The total production amount is 165,000 kilograms, the amount of waste is 311 kilograms, representing 0.188 percent, valued at 55,525.94 baht. which can reduce the cost of waste The value of waste is 35,886.54 baht and the amount of waste is reduced by 60.74 percent, which can reduce the cost of waste per year equal to 143,546.16 baht, which is in line with the objective of waste not exceeding 0.200 percent
References
Chaikanha, N., Phuhuadon, D., Dechawong, L., & Phurabat, S. (2018). Defective Parts Reduction in Automotive Wire Assembly Industry by LEAN theory: A Case study. International Conference on Embedded Systems and Intelligent Technology & International Conference on Information and Communication Technology for Embedded Systems (ICESIT-ICICTES), INSPEC Accession Number: 18044503, DOI: 10.1109/ICESIT-ICICTES.2018.8442055
Joshi, A., & Jugulkar, L.M. (2014). Investigation and Analysis of Metal Casting Defects and Defect Reduction by Using Quality Control Tools. Proceedings of IRF International Conference, Goa, 16th March-2014, 86-91.
Awaj, Y. M., Singh, A. P., & Amedie, W. Y. (2013). Quality Improvement Using Statistical Process Control Tools in Glass Bottles Manufacturing Company. International Journal for Quality Research, 7(1), 107–126.
Leni, A. S., & Sembiring, A. C. (2022). Quality Control Improvement Using Seven Tools and Six Sigma Methods at Pt. Xyz. Mantik Journal, 6 (2), 1656-1663.
Pacholek, B., & Matuszak, L. (2021). Analysis of the Production Process Performance Indicators as a Tool for Improving Operational Efficiency and Reducing Losses in the Production of Sausages. Proceedings of the 37th International Business Information Management Association, 4963-4972.
Da Silva, V.L., Kovaleski, J.L., Pagani, R.N., De Matos Silva, J., & Corsi A. (2020). Implementation of Industry 4.0 Concept in Companies: Empirical Evidence, International Journal of Computer Integrated Manufacturing, 33(4), 325-342.
Huang, S.H., Dismukes, J.P., Shi, J., Su, Q., Wang, G., Razzak, M.A., & Robinson, D.E. (2002). Manufacturing System Modeling for Productivity Improvement. Journal of Manufacturing Systems, 21(4), 249-259.
Srisorayut, A. & Suwittayaluk, P. (2016). Measurement System Analysis of a Small Loudspeaker Manufacturing Process, Proc. of (8th RSC) Rajamangala Surin Nation Research Conference, Surin, Thailand, Dec. 22-23, 2016, 581-585. Retrieved from https://rd.surin.rmuti.ac.th/rsnc2021/download-proceedings.
วรเทพ ตรีวิจิตร และ เถลิง พลเจริญ. (2565). การลดของเสียจากกระบวนการตรวจสอบเหล็กแผ่นม้วน กรณีศึกษา: โรงงานตัวอย่าง. วารสารวิทยาศาสตร์และเทคโนโลยี มหาวิทยาลัยธนบุรี, 6(1), 1-15.
วรเทพ ตรีวิจิตร และ ชาคริต ศรีทอง. (2562). การลดของเสียชิ้นส่วนยานยนต์ S801-13-810W กรณีศึกษาโรงงานตัวอย่าง. การประชุมวิชาการข่ายงานวิศวกรรมอุตสาหการ ประจำปี 2562, จุฬาลงกรณ์มหาวิทยาลัย. 499-504.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 thaloeng poljaroen, วรเทพ ตรีวิจิตร, ชาคริต ศรีทอง

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
